Oil executives meeting in London have argued that the industry must move from just-in-time exports toward just-in-case infrastructure after disruption around the Strait of Hormuz and Bab el-Mandeb. Proposals include greater use of Fujairah, northern Iraqi routes and possible links toward Mediterranean ports. The strategic case is clear: production capacity has limited value when a single maritime passage determines whether barrels reach buyers.

The region has learned that logistics can price the barrel

War-risk insurance, shipping delays and damaged refining or port capacity can widen product shortages even when crude remains underground. Alternative routes reduce concentration, but pipelines, storage and terminals require large upfront capital and years of permitting and construction. They also cross jurisdictions whose politics and security can change faster than project finance assumptions.

Redundancy needs a revenue model

Infrastructure built only for emergencies may sit underused in normal periods. Governments can treat that spare capacity as strategic insurance, while listed operators need predictable returns. The durable models will combine commercial throughput with availability payments, transparent access rules and shared financing among producers, traders and consuming states. Otherwise, resilience becomes a public promise attached to an uneconomic asset.

Contracts will separate strategy from conference talk

Track binding ship-or-pay commitments, cross-border treaties, tariff structures, environmental approvals and construction awards. Expansion at established nodes such as Fujairah is more executable than a wholly new multi-country corridor, but it cannot solve every route risk. The Gulf's advantage will increasingly be measured by how many reliable paths each export has, not only by how many barrels can be produced.

How to use this analysis

Infrastructure develops through planning, consent, procurement, construction, commissioning and use. Proposed capacity should not be added to operating capacity, and throughput should not be confused with design limits. For a business user, local connection, reliability, price and service date are often more important than national totals.

Source and verification note

The reporting base for this article is Reuters: oil executives call for more export routes after disruption and Fujairah Oil Industry Zone: infrastructure and terminals. The link is provided to the source page or release so readers can check the reporting period, definitions and later revisions. Figures are not extended beyond the source's geographic or institutional scope, and forecasts remain labelled as expectations until an official release records the outcome.