69

Rows or archive records currently included under this product's stated inclusion rules.

Source domains

1

Distinct source domains visible in the current research table. Archive indexes can also contain source labels retained inside the underlying articles.

Review schedule

Weekly archive refresh and event-driven stage updates after contracts, construction milestones, openings or scope changes.

The review cadence is part of the dataset methodology. Material events can trigger an earlier update.

Version control

v1.1

Last reviewed 2026-09-08. Historical observations are preserved rather than silently rewritten where context matters.

Dataset measure

Indexed research items

69

Dataset measure

Categories represented

4

Dataset measure

Primary topics represented

68

Dataset measure

Coverage window

2026-05-13 to 2026-09-16

Dataset measure

Structured observations

11

What the research currently shows

The index treats a megaproject as a collection of independently staged components rather than assigning one delivery status to an entire masterplan.

Opening dates, construction starts and contract awards are separate evidence events, reducing the risk of presenting promotional target dates as delivered infrastructure.

Questions this dataset is built to answer

  • Which megaproject components have moved from announcement into contracted or physical delivery?
  • Which dates are developer targets versus independently evidenced openings?
  • How have scope, phase or capital assumptions changed over time?

Announced

Publicly proposed by a developer, government or project company.

Contracted

A material delivery contract has been awarded, but this does not establish construction completion.

Under construction

Physical work is documented for the defined project or phase.

Operating/open

The relevant component has opened or begun operations; this status is not inherited by the entire megaproject.

Scope change

Material reduction, expansion, phasing or redesign compared with a previous public plan.

Source hierarchy

  1. Primary official sources, company filings, regulator publications and operator disclosures are preferred for factual dataset records.
  2. High-quality wire reporting or specialist trade reporting with an explicit attributable source trail may be used where it adds a dated physical-project fact not available in a practical first-party source.
  3. Secondary press, estimates and promotional claims are not promoted into dataset facts unless their status and provenance are clearly labelled.

Data quality controls

  • Observation date and publication date are kept distinct where the underlying fact is time-sensitive.
  • Announced, planned, under-construction and operating states are not collapsed into one status.
  • Parent programme IDs distinguish child-site milestones from wider investment programmes so nested values are not silently double counted.
  • Reported results, management guidance, analyst opinions and policy targets remain separate evidence classes.
  • Missing values remain missing rather than being filled with inferred or modelled estimates.
  • Historical observations preserve earlier stated values and milestones rather than silently replacing them with the newest figure.
  • Material revisions are recorded so later updates do not erase the historical basis of an earlier observation.
Revision history

8 Sep 2026: added component-level delivery and scope-change definitions.

Evidence timeline

These dated observations preserve additional evidence about how investment commitments, project stages, regulatory milestones and ecosystem measures changed over time. They are not treated as additional current totals. Where a later disclosure supersedes an earlier figure, both observations remain visible with their dates and source context.

Gulf Megaproject Delivery Index: historical observations. Showing 11 of 11 records.
2022Port of NEOM operating baselinePort operating since 2022 with container, warehousing, breakbulk, project-cargo and ferry servicesSaudi ArabiaOpen sourceOperating infrastructure observation inside the broader Oxagon development.
2025Oxagon AHG industrial-gases facilitySAR600m phased industrial-gases production and distribution investment announcedSaudi ArabiaOpen sourceTenant investment is treated as a component-level industrial-delivery record.
2026Port of NEOM expansionAdvanced container-terminal openings scheduled to begin in phases during 2026Saudi ArabiaOpen sourcePhased opening is not treated as full 2030 capacity.
2026THE LINE delivery approachNEOM describes THE LINE as advancing through a phased, demand-led approachSaudi ArabiaOpen sourceCurrent developer framing is preserved rather than assigning a single completion date to the entire masterplan.
2026-02 targetOxagon AHG facilityGroundbreaking scheduled for February 2026 with operations due in late 2026Saudi ArabiaOpen sourceDeveloper timetable, not evidence that operation had begun at announcement.
2026-05-20Four Seasons Red SeaFour Seasons Resort and Residences at Shura began receiving guestsSaudi ArabiaOpen sourceOperating hospitality component within The Red Sea destination.
2026-06-07AlWajh International AirportAirport reopened after Red Sea Global modernisation, with domestic services restoredSaudi ArabiaOpen sourceDelivered infrastructure milestone rather than a future masterplan target.
2026-06-15AMAALA Triple BayFour Seasons Resort and Residences AMAALA opened and marked the start of operations at the destinationSaudi ArabiaOpen sourceDestination-level operating milestone anchored to one opened asset.
2026-08-18Rosewood AMAALARosewood AMAALA opened at Triple BaySaudi ArabiaOpen sourceAdditional operating component; not used to imply the whole destination is complete.
2026-08-31Oxagon AI data centreHUMAIN and DataVolt began construction on 100MW within a 360MW first phaseSaudi ArabiaOpen sourceConstruction milestone tied to a defined component and phase.
2030 targetPort of NEOM capacityPlanned container capacity of 1.5m TEU by 2030, versus current disclosed 250,000 TEUSaudi ArabiaOpen sourceFuture capacity ceiling retained separately from operating capacity.
Gulf Megaproject Delivery Index, version 1.1. Showing 69 of 69 records.
2026-09-16Gulf AI Infrastructure Map: Data Centres, Compute, Power and Major ProjectstechnologyGulf AI data center investmentIEA: Energy and AIOpen source
2026-09-16Saudi Oil Disruption Shows Why Export Routes Matter as Much as Production CapacityenergySaudi oil cargoes pipeline disruptionIEA: Energy and AIOpen source
2026-09-15Saudi East-West Pipeline Shutdown Puts the Kingdom's Hormuz Bypass Under PressureinfrastructureSaudi East West Pipeline shutdownSaudi Ministry of Energy via SPA: East-West Pipeline shutdownOpen source
2026-09-14Saudi Arabia's Red Sea Oil Export System: Pipeline, Yanbu and the Routes Beyond HormuzinfrastructureSaudi Red Sea oil export capacityU.S. EIA: Saudi Arabia country analysisOpen source
2026-09-14Saudi Arabia vs UAE: Which Country Has More Capacity to Bypass Hormuz?infrastructureSaudi UAE Hormuz bypass pipelinesU.S. EIA: Strait of Hormuz remains critical oil chokepointOpen source
2026-09-14Hormuz Is Only One Chokepoint: How Gulf Oil Moves Through Bab el-Mandeb and SuezinfrastructureGulf oil chokepoints Hormuz Bab el Mandeb SuezU.S. EIA: Red Sea chokepointsOpen source
2026-09-14Why Spare Pipeline Capacity Is Geopolitical Insurance for Oil Exportersinfrastructureoil pipeline spare capacity geopolitical riskU.S. EIA: Strait of Hormuz remains critical oil chokepointOpen source
2026-09-14Saudi East-West Pipeline Shutdown Exposes the Gulf's Most Important Oil Bypass RouteinfrastructureSaudi East-West Pipeline shutdownSaudi Press Agency: East-West Pipeline shut down as precautionOpen source
2026-09-14UAE's 5GW AI Campus Is Becoming a Critical-Infrastructure Security ProjecttechnologyUAE 5GW AI campusReuters: UAE revises AI data-centre plan after attacksOpen source
2026-09-14Saudi East-West Pipeline Explained: Route, Capacity and Why It Bypasses HormuzinfrastructureSaudi East-West PipelineSaudi Press Agency: East-West Pipeline shut down as precautionOpen source
2026-09-14Yanbu Oil Infrastructure: Why Saudi Arabia's Red Sea Export System MattersinfrastructureYanbu oil export infrastructureSaudi Press Agency: East-West Pipeline shut down as precautionOpen source
2026-09-13Saudi Arabia and the UAE Are Absorbing Most of the Gulf's Next-Dollar AttentioninvestmentGulf investment Saudi UAE 2026IMF: 2026 Article IV consultation with Saudi ArabiaOpen source
2026-09-13Gulf Employers Expect AI to Change Hiring Without Ending Headcount GrowthtechnologyGulf AI hiring 2026IMF: Gulf Cooperation Council economic prospects and AIOpen source
2026-09-12UAE Redesigns 5GW AI Data Centre Plan Around Security After Iranian AttackstechnologyUAE 5GW AI data centre redesignReuters: UAE revises AI data center plan after Iranian attacksOpen source
2026-09-12The Gulf Is Spending Billions to Become an AI Superpower. What if the Technology Is More Dangerous Than Expected?technologyGulf AI investment 2026Reuters: UAE revises AI data-centre plan after attacksOpen source
2026-09-1280% of Employed Saudis Are Highly Exposed to AI. What Does That Mean for Vision 2030?technologySaudi jobs AI exposureIMF: Saudi Arabia 2026 Article IV consultation, Annex VII on AIOpen source
2026-09-11Gulf Data Centre Capacity Explained: Why MW, IT Load and Campus Targets Are Not the SametechnologyGulf data centre capacityGBR methodology based on operator, utility and cloud-provider disclosures. Figures are retained in the units and delivery stages used by the underlying source.Open source
2026-09-11Gulf Data Centre Operators and Developers: Who Is Building the GCC's Compute Infrastructure?technologyGulf data centre operatorsKhazna Data CentersOpen source
2026-09-11Power and Cooling Are the Real Constraints Behind Gulf AI Data CentrestechnologyGulf data centre powerGBR infrastructure methodology and named operator disclosures. Project-level power and cooling claims are only carried into trackers where the operator, utility or project document supports them.Open source
2026-09-11Sovereign Cloud vs Public Cloud in the Gulf: What Businesses Are Actually BuyingtechnologyGulf sovereign cloudProvider and regulator materials from Gulf cloud and sovereign-compute programmes. Sovereignty claims are described according to the controls publicly disclosed by the provider or customer.Open source
2026-09-11Beyond Saudi Arabia and the UAE: Qatar, Bahrain, Oman and Kuwait's Cloud and Data-Centre MarketstechnologyGCC cloud data centresAWS Global InfrastructureOpen source
2026-09-10UAE-Led Consortium Commits $1 Billion to Put AI Processing Into a 50-Satellite ConstellationtechnologyUAE AI satellite projectEmirates News Agency: Marlan Space and Loft Orbital announce $1 billion AI satellite infrastructureOpen source
2026-09-09Gulf Sovereign Capital & Project Index: Funds, National Champions and DeliveryinvestmentGulf sovereign wealth funds projectsPublic Investment FundOpen source
2026-09-09Gulf Data Centre Project Database: Cloud, AI and Hyperscale Capacity by ProjecttechnologyGulf data centre projectsMicrosoft Saudi Arabia EastOpen source
2026-09-09Saudi Arabia Data Centre Tracker: AWS, Microsoft, HUMAIN and the Kingdom's AI BuildouttechnologySaudi Arabia data centre trackerMicrosoft Saudi Arabia East regionOpen source
2026-09-09UAE Data Centre Tracker: Stargate, Khazna, Microsoft and the Race for AI CapacitytechnologyUAE data centre trackerOpenAI Stargate UAEOpen source
2026-09-09GCC Data Centre Capacity Tracker: Saudi Arabia, UAE, Bahrain, Qatar, Oman and KuwaittechnologyGCC data centre capacityAWS regionsOpen source
2026-09-09Gulf Cloud Regions Status: AWS, Microsoft, Google and Oracle Across the GCCtechnologyGulf cloud regionsAWS global infrastructureOpen source
2026-09-08Strait of Hormuz Traffic Is Still Constrained. The Gulf's Alternative Export Routes Matter More Every WeekinfrastructureStrait of Hormuz traffic September 2026Reuters: Iran threatens new Gulf exclusion zoneOpen source
2026-09-07Saudi Arabia Data Centre Investment: The Projects and Players to TracktechnologySaudi Arabia data centre investmentAWS Saudi Arabia region investmentOpen source
2026-09-07UAE Data Centre Projects: Stargate, Khazna, G42 and the Abu Dhabi BuildouttechnologyUAE data centre projectsOpenAI: Introducing Stargate UAEOpen source
2026-09-07Gulf Cloud Regions: AWS, Microsoft, Google and Oracle Across the GCCtechnologyGulf cloud regionsAWS global infrastructureOpen source
2026-09-07Middle East Data-Centre Investment Could Reach $1.1 Trillion: The Constraint Is Not CapitaltechnologyMiddle East data centre investmentPwC: Global Data Centre Outlook 2026-50Open source
2026-09-05Which Gulf AI Data Centres Are Actually Under Construction in 2026?technologyGulf AI data centres under construction 2026Gulf AI Infrastructure TrackerOpen source
2026-09-05UAE vs Saudi Arabia: Who Has the Stronger AI Infrastructure Pipeline in 2026?technologyUAE vs Saudi AI infrastructure 2026Gulf AI Infrastructure TrackerOpen source
2026-09-05The Gulf's Biggest AI Infrastructure Projects in 2026technologylargest Gulf AI infrastructure projectsAbu Dhabi Media Office: Stargate UAE and 5 GW campusOpen source
2026-09-05Abu Dhabi's K2 Horizon Makes a More Serious Open-AI Bet Than Most 'Open' Model ReleasestechnologyK2 Horizon AI modelsInstitute of Foundation Models: K2 Horizon press releaseOpen source
2026-09-04Saudi Arabia's LEAP Data-Centre Buildout: The Megawatts Matter More Than the $15 Billion HeadlinetechnologySaudi data center investment LEAP 2026SPA: LEAP Day Two data-centre and technology announcementsOpen source
2026-09-04HUMAIN and DataVolt Start Work on 100MW of Oxagon AI Data-Centre CapacitytechnologyHUMAIN DataVolt Oxagon data centerNEOM HUMAIN and DataVolt announcementOpen source
2026-09-04Qatar and UAE LNG Cargoes Used Rare Ship-to-Ship Transfers Outside HormuzinfrastructureLNG ship to ship Strait of HormuzReuters on Qatar and UAE LNG transfersOpen source
2026-09-01Saudi Arabia's AI Data Centre Buildout: The Projects, Capacity and Reality ChecktechnologySaudi Arabia AI data centresReuters: Humain and DataVolt Oxagon data-centre partnershipOpen source
2026-09-01Humain and DataVolt's 100MW Oxagon Data Centre Is Important for What It Makes ConcretetechnologyHumain DataVolt Oxagon data centreReuters: Humain and DataVolt Oxagon data-centre partnershipOpen source
2026-08-29UAE vs Saudi Arabia: Two Different Models for Building a Gulf AI EconomytechnologyUAE vs Saudi Arabia AI infrastructureOpenAI: Introducing Stargate UAEOpen source
2026-08-28How the Gulf Is Building Around the Strait of HormuzinfrastructureGulf infrastructure bypass Strait of HormuzReuters: Gulf ports and pipelines investment around Hormuz disruptionOpen source
2026-08-26Who Is Building the Gulf's AI Infrastructure? G42, Humain, Core42, Khazna and DataVolt ExplainedtechnologyGulf AI infrastructure companiesOpenAI: Introducing Stargate UAEOpen source
2026-08-25Which Gulf Oil Export Routes Can Bypass the Strait of Hormuz?infrastructureoil export routes bypass Strait of HormuzReuters: Gulf ports and pipelines investment around Hormuz disruptionOpen source
2026-08-20The Gulf's Largest Container Ports: Scale, Location and What Throughput Really Measuresinfrastructurelargest container ports GulfDP World: Jeddah South Container Terminal July 2026 recordOpen source
2026-08-14GCC Railway in 2026: What Is Actually Built, and What Still Has to ConnectinfrastructureGCC railway network 2026GCC Secretariat: GCC Railway projectOpen source
2026-08-11Saudi Project Capital Should Be Counted by StageinvestmentSaudi project investmentSaudi Vision 2030 annual reportsOpen source
2026-08-10Can Gulf Power Grids Support the AI Data Centre Boom?technologyGulf AI data centres power demandOpenAI: Introducing Stargate UAEOpen source
2026-07-27There Is No Single Gulf Fintech LicencetechnologyGulf fintech regulationCentral Bank of BahrainOpen source
2026-07-22Saudi Digital Payments Are Building Merchant Infrastructure, Not Just Replacing CashtechnologySaudi digital payments businessesSaudi Central Bank statisticsOpen source
2026-07-21Gulf Port Rankings Break When Cargo Types Are MixedinfrastructureGulf ports comparisonDP World annual reportsOpen source
2026-07-18Gulf Electricity Production Reached 784.9 TWh. Networks Decide Its ValueinfrastructureGCC electricity productionGCC-Stat data portalOpen source
2026-07-17Bahrain's Fintech Advantage Depends on What Happens After the SandboxtechnologyBahrain fintech regulation startupsCentral Bank of BahrainOpen source
2026-07-15A Bahrain Fintech Licence Is the Start of the Commercial TesttechnologyBahrain fintech regulationCBB fintech and innovationOpen source
2026-07-12Qatar's Non-Energy Investment Test Comes After ConstructioninvestmentQatar non energy investmentQatar National Planning Council statisticsOpen source
2026-06-30Oman's Port Advantage Is Only Valuable When Industry Uses ItinfrastructureOman port capacity industrial demandASYAD Group portsOpen source
2026-06-27Airport Capacity Is Not Passenger Demand in QatarinfrastructureHamad airport capacityHamad International AirportOpen source
2026-06-26Gulf Data Centres Compete on Power, Water and CustomerstechnologyGulf data centresUAE Digital Economy StrategyOpen source
2026-06-21The UAE's Non-Oil Trade Scale Matters, but the Mix Matters MoreinvestmentUAE non oil tradeUAE Federal Competitiveness and Statistics CentreOpen source
2026-06-06Saudi Point-of-Sale Data Is Fast and Easy to MisreadtechnologySaudi point of sale transactionsSAMA weekly point-of-sale dataOpen source
2026-05-31The Gulf's Desalination Scale Is Also a Power QuestioninfrastructureGulf desalinationGCC-Stat data portalOpen source
2026-05-28Comparing Gulf Sovereign Funds Takes More Than an Assets RankinginvestmentGulf sovereign wealth fundsInternational Forum of Sovereign Wealth Funds membersOpen source
2026-05-26Stargate UAE Makes Abu Dhabi a Test Case for Sovereign-Scale AI InfrastructuretechnologyStargate UAEOpenAI: Introducing Stargate UAEOpen source
2026-05-19Oman's Three-Port Strategy Has Three Business CasesinfrastructureOman portsASYAD portsOpen source
2026-05-18Qatar's LNG Expansion Has Three Tests: Capacity, Contracts and CashenergyQatar LNG capacity contracts revenueQatarEnergy LNG overviewOpen source
2026-05-13HUMAIN Gives Saudi Arabia a Single Vehicle for Building the Full AI StacktechnologySaudi HUMAINPIF: HUMAIN portfolio profileOpen source
2026-05-13Qatar's LNG Expansion Is Also a Domestic Capacity TestenergyQatar LNG expansionQatarEnergy LNG overviewOpen source

Dataset methodology

Scope

GBR reporting on large Gulf infrastructure, energy and technology programmes where project delivery, capacity or capital commitment are central.

Inclusion criteria

Records must identify a GCC project, operator or public institution and preserve the distinction between announcement, financing, construction and operation.

Exclusions and limitations

Promotional masterplan claims without a sourced delivery milestone or operating context are excluded from the recurring index.

Revision policy

The index is rebuilt from the publication archive as new qualifying reporting is added. Historical article dates and source attribution remain unchanged; new observations are appended rather than backfilled with inferred facts.

Reuse and attribution

Journalists, researchers and analysts may quote figures with attribution to Gulf Business Review, the dataset version and review date. For substantial republication, chart reuse or data licensing, contact editor@gulfbusinessreview.com.